Projects
The project involves the construction of a stadium for fighting and martial arts, which if necessary can also be used for boxing and wrestling tournaments with the creation of a par-terre, where there are also about 1,000 spectators. Determining a total capacity of over 5500 seats. The articulation of the building morphological status of the fight two components, the hall for events and the body that houses the integrative functions,.
The structure has three levels and hosts:
-At the first level
The golf game;
8 Palestinian training;
A swimming pool for training in water;
Local service for athletes;
A large lobby with bar and reception services;
Local service to the public;
Local technology and warehouse.
At the second level
The service tunnel to the stands and the main system of inputs and outputs of an emergency;
Services for the public;
The eateries, rescue and police;
The box for the commentary and commentary;
The press rooms;
Offices and meeting rooms for sports federations.
-At the third level
The box for the commentary and commentary;
The press rooms;
Offices and meeting rooms for sports federations.
Crowning the structure of the stands was envisaged the construction of a tunnel that runs through the entire development of the stands. This is in keeping with the cover containing the integrative functions of the body where it was obtained with an outdoor training area of the track for the race.
Complete structure of the project a functional purpose field for outdoor workout activities, together with a running track and a trail of cross-country race. It 'also provided accommodation in a wide green areas surrounding the creation of a parking lot for 500 cars.
Regarding the definition of the architecture of the "Palace of the struggle" there is a tendency to define structural elements simple. In particular, we worked on the morphological and geometric characterization of the structural system of the stands and coverage. And 'in fact the development of this system in space to determine the overall structure of the building, producing a sequence of architectural events. A second criterion used in the design on the permeability of the building. Permeability functional but also visually obtained with a pronounced use of glass surfaces and structural facades.
The building will also characterized by a high environmental sustainability and particular attention will be placed in the limiting energy use for lighting, heating and cooling. Green areas will also be provided for the use of constructed wetlands wastewater coming from the plant. Even structural building materials and will not be preferentially of ecological and / or renewable.