Projects
The theme proposed by the contracting Authority is the enlargement of the existing cemetery within the existing cemetery enclosure, with the instrument of project finance.
The investor asked us to draw up the proposals in the project on the basis of information provided by the notice and the feasibility study published by the local administration.
The design solution developed and illustrated here has been informed to the integration with the existing architecture and morphological.
The study of the typological elements of bases has allowed to draw out more complex aggregations that have been integrated to the existing parts of the building. The high organizational flexibility has also allowed us to reduce the movements of the earth and to respect the orographic structure of the soil.
This project provides a qualification morphological entire area concluding inserting a kind of amphitheater of new components built resting on the topography of the hill and returning a unified and integrated infrastructure of the entire cemetery.